Fence post concrete calculator
Estimate concrete and gravel for round or square fence-post holes.
Results
Select Calculate to see results for your measurements.
Use your results
How it works
How to measure
Count the posts. Measure the post width or diameter, the hole width or diameter, the full hole depth, and the depth of any compacted gravel base. Check the concrete bag yield from its label or product data sheet.
Formula
Hole cross-sectional area is π × (diameter ÷ 2)² for round holes or width² for square holes. Concrete = post count × (hole area − post area) × (hole depth − gravel depth). Gravel is estimated over the same hole-minus-post cross-section and base depth. Add extra concrete and round up to whole bags.
Worked example
Four 100 mm square posts in 300 mm diameter holes, 0.8 m deep, with a 0.15 m gravel base and no extra.
4 × (π × 0.15² − 0.1²) × (0.8 − 0.15) gives about 163 L of concrete. The same cross-section over the 150 mm base gives about 36 L of gravel. At 11 L per bag, round up to 15 bags.
What changes the result
Hole size and depth drive the concrete volume. A larger post displaces more concrete; a deeper gravel base reduces the concrete depth. Bag yield sets the final number of bags.
Assumptions and sources
The starting post and hole dimensions are illustrative. The cited QUIKRETE 50 lb fast-setting mix yields approximately 11 L per bag. Use the yield for your chosen product. QUIKRETE suggests holes about three times post width and a 6 in gravel base in its specific method; those are editable, not universal requirements.
Assumes straight, constant cross-sections and that the post occupies its cross-section through the gravel and concrete. It does not model tapered or irregular holes, soil movement, post treatment, wind loads, drainage, or local construction rules. Follow the selected product label and site requirements.
Use this estimate for planning. For engineering or code-compliance questions, consult a qualified professional.
- QUIKRETE guide: setting posts and gravel base (checked )
- QUIKRETE Fast-Setting Concrete Mix data sheet (11 L per 50 lb bag) (checked )
- NIST SI conversion factors (checked )
Method version 1.0