Concrete slab calculator
Multiply a slab’s length by its width and thickness in matching units to find the concrete volume. Add your extra allowance, then round up to whole bags using the mixed yield on the label or to the supplier’s ready-mix increment. Compare slab quantities for 10x10 ft, 10x12 ft and 12x12 ft.
Results
Select Calculate to see results for your measurements.
Use your results
How it works
How to measure
Measure each rectangular pour inside the form: length and width. For a round column or footing, measure its inside diameter. Enter the pour thickness or depth and check the volume yield printed on the concrete bag or supplier quote.
Formula
Rectangle volume = length × width × thickness. Round volume = π × (diameter ÷ 2)² × thickness. Add the selected extra percentage, then round up to whole bags or supplier increments.
Worked example
A 4 m × 3 m slab, 0.1 m thick, with 10% extra and 11 L per bag.
4 × 3 × 0.1 = 1.2 m³ net; 1.2 × 10% = 0.12 m³ allowance; adjusted need 1.32 m³. At 0.011 m³ per bag, ceil(1.32 ÷ 0.011) = 120 bags.
What changes the result
Length, width, and thickness scale volume directly. Bag yield or delivery increment determines rounding; the editable extra allowance raises the order quantity.
Common sizes
| Slab | Volume with extra | Bags to buy |
|---|---|---|
| 4 × 4 ft | 0.22 yd³ | 10 |
| 8 × 10 ft | 1.09 yd³ | 49 |
| 10 × 12 ft | 1.63 yd³ | 74 |
| 12 × 16 ft | 2.61 yd³ | 118 |
Waste and allowance
| Situation | Allowance | How to apply it |
|---|---|---|
| Measured forms and uniform base | Around 4% | Start at the lower end of the ready-mix guidance when the depth is consistent. NRMCA CIP 8 yield guidance |
| Uneven subgrade or uncertain volume | Toward 10% | Allow for low spots, spillage and form movement. Recheck unusual pours with your supplier. NRMCA CIP 8 yield guidance |
Questions and answers
How much concrete do I need for a 10x10 slab?
At 4 in thick, a 10 ft by 10 ft slab takes about 33.33 ft³. With 10% extra, the total is about 36.67 ft³, or 1.36 yd³. At a mixed yield of 0.6 ft³ per bag, round up to 62 bags.
How do I include a thickened edge?
Estimate the main slab first. Then count only the added depth below it in a separate estimate.
What should I enter in ready-mix mode?
Use the supplier’s volume increment. Confirm their minimum order and any short-load fees.
What if the slab thickness varies?
Divide the prepared base into zones of similar depth and add their required volumes before confirming an order.
Assumptions and sources
The starter slab and 10% extra are illustrative. The cited QUIKRETE 50 lb fast-setting mix yields approximately 11 L per bag. Use the yield on your selected product. For ready-mix, enter the supplier increment and price.
Uniform, level forms are assumed. This estimate excludes subgrade, reinforcement, forms, joints, pump charges, minimum delivery orders, and site-specific structural design. Ready-mix order increments and minimums vary by supplier.
Use this estimate for planning. For engineering or code-compliance questions, consult a qualified professional.
- QUIKRETE Fast-Setting Concrete Mix data sheet (11 L per 50 lb bag) (checked )
- NIST SI conversion factors (checked )
Method version 1.0