Paver base calculator

Estimate loose aggregate base and bedding sand for paving layers.

Measurements and materials

Shared layer footprint
Aggregate base
Bedding sand

Results

Select Calculate to see results for your measurements.

Use your results

How it works

How to measure

Measure each layer footprint and its specified thickness separately. Mark thickness as installed or loose. Enter a supplier or measured loose-to-installed multiplier only for installed depth.

Formula

Geometric layer volume is area × thickness. For installed depth, multiply by the loose factor; loose depth needs no compaction adjustment. Apply separately measured handling loss once and round to the supplier increment.

Worked example

A 4 m × 3 m area, 0.1 m installed aggregate at a measured 1.25 loose factor, and 0.025 m loose sand.

Base: 12 × 0.1 = 1.2 m³ installed; × 1.25 = 1.5 m³ loose, including 0.3 m³ compaction extra. Sand: 12 × 0.025 = 0.3 m³, or 15 × 20 L bags.

What changes the result

Footprint, thickness, the measured loose factor, handling allowance, and supplier increment control delivered volume.

Assumptions and sources

Depths, loose factors, density, and sale increments are user inputs. Belgard describes a 1 in loose screeded bedding example; it receives no compaction multiplier.

Material quantity only; this does not specify foundation design, traffic capacity, drainage, frost depth, grading, or edge extension.

Use this estimate for planning. For engineering or code-compliance questions, consult a qualified professional.

Method version 1.0